KV-5 (Object 225) - A cancelled project for a super-heavy tank. Armament was to be a 107 mm ZiS-6 gun in a large turret and machine-gun in a small secondary turret. Weight was projected as about 100 tons, and the tank was to have 150-180mm of armor. Project development began in June 1941, however was cancelled due to the Siege of Leningrad, in which all developmental operations at the Kirov Plant were halted. The project fell out of favour from the more advanced heavy tank designs, and no prototype was built.
Los datos correspondientes no están disponibles.
KV-5 (Object 225) - A cancelled project for a super-heavy tank. Armament was to be a 107 mm ZiS-6 gun in a large turret and machine-gun in a small secondary turret. Weight was projected as about 100 tons, and the tank was to have 150-180mm of armor. Project development began in June 1941, however was cancelled due to the Siege of Leningrad, in which all developmental operations at the Kirov Plant were halted. The project fell out of favour from the more advanced heavy tank designs, and no prototype was built.
Nuestros asesores y expertos en surtido están listos para responder sus preguntas (Lu–Vi, 8–18 horas).
Pregúntenos lo que necesite, le responderemos lo antes posible.
Los textos de los clientes en el asesor reflejan únicamente las opiniones y puntos de vista de los clientes. La empresa MNF trade s.r.o. no aprueba ni verifica previamente los textos de los clientes.
Aún no hay preguntas aquí. ¡Sea el primero en preguntar!